GFP Mobile Mix Supply providing a special grout mix through a 2” pump line to the fifth story of the Goldey Beacom College Dorm Expansion Project. Our trucks are capable of maintaining the consistent slump required throughout the entire process of grouting the precast planks during the slow process of filling the cores. This placement process is a challenge for ready mix trucks because the cement generates heat in the drum and limits the amount of time needed to unload the truck. Our mix is always fresh whether the project takes (1) hour or (3) hours to complete.
NO CONCERNS FOR A REJECTED LOAD!